Welcome to Driveways & Sidewalks Guide
Permeable Driveways Article
. For a permanent link to this article, or to bookmark it for further reading, click here.
Driveway Paving Explained
from:Paving a driveway may seem like a daunting task, but it may not be as complicated as you perceive. When you have a better understanding of what is involved in paving a driveway, you will most likely be ready to take steps to pave your driveway. Whether you plan to do it yourself, or contract with a driveway professional, it’s important to do your homework and conduct research so you understand what to expect. Of course, if you have no experience in this area, paving your driveway is best left to the experts!
The following information provides you with the basics related to driveway paving – but don’t try this at home without a professional guide!
1. Driveway paving starts by adequately preparing the surface for pavement. This often entails some grading with heavy equipment to ensure the surface is well prepared and level.
2. Paving a driveway requires a good assessment of the available area for paving. It’s important to allow enough length and width for pavement to accommodate your vehicles. If you plan to pave a double-wide driveway, you’ll need more width of course. At a minimum, measure off at least 10 feet in width for a driveway and 20 feet in length. Although you can possibly get by with less, this is the best recommendation.
3. Driveways start with a good, solid base. That means that you’ll need to have a layer of gravel spread before the driveway is paved. Gravel will probably be about 2 inches thick but it is important not to have it too thick. About 2-6 inches is recommended but a driveway paving expert will have specific recommendations based on the type of paving material you plan to use.
4. Once gravel is in place and has been smoothed and distributed evenly over the surface, the asphalt or other product will be poured. This is when a driveway professional comes in handy!
5. If you are using asphalt, it must be expertly spread across the area very evenly and smoothly. There are special tools used by professionals to ensure the surface is smooth. This is important. Once it is level, additional gravel will be added for strength and durability and this must also be expertly pushed into the asphalt with heavy mechanical rollers for a smooth surface.
6. If you’re using something other than asphalt, there may be other steps included other than or in addition to those above.
7. Once a driveway is paved, it is important to let it dry and ‘cure’ for a couple of days. The length of time this takes depends on the product used, but at least a day is needed for all products.
The above steps are a general outline of what is required when paving but they are not meant to prepare you to do-it-yourself! Paving a driveway takes knowledge, experience, and skill. Make sure you consult a professional before you embark on a project of this magnitude.
Permeable Driveways News
Debuting at the International Builders Show Next Week, AZEK VAST (R) Pavers Provide New Business Opportunities for ...
Manufactured with up to 95 percent post-consumer recycled rubber and plastics, AZEK VAST Pavers offer visual appeal, design flexibility, strength, and durability. Available in five appealing colors, AZEK VAST Pavers are stain, impact and scratch resistant. With an innovative grid system and less than half the weight of traditional pavers, AZEK VAST Pavers install up to three times faster than ...
Read more...Legal Advertisements: Week of January 12, 2012
LEGAL NOTICE NOTICE IS HEREBY GIVEN, that the following hearings will be held by the Shelter Island Zoning Board of Appeals on the 25th day of January, 2012 at the Shelter Island Town Hall, 38 N. Ferry Road, Shelter Island, New York. Applications are scheduled to begin at 7:30 p.m., or thereafter. Applications may be [...]
Read more...South Sounders create, use rain yards to harvest water
Got rain? Of course you do. Sometimes in the Northwest it can seem like that’s all we do have. Yet there’s always a period of total drought midsummer when your water bill skyrockets, and forecasters are predicting that situation will only get worse. Time to get creative with the rain – and a handful of South Sounders are exploring three different ways: above ground, in-ground and below ground.
Read more...South Sounders get creative, harvest rain
Got rain? Of course you do. Sometimes in the Northwest it can seem like that’s all we do have. Yet there’s always a period of total drought midsummer when your water bill skyrockets, and forecasters are predicting that situation will only get worse. But so will flooding. Plus, the big problem is that pollutants in stormwater runoff can hurt Puget Sound. Time to get creative with the rain – and a ...
Read more...Planners recommend against development
The Grover Beach Planning Commission is recommending the City Council deny a vesting tentative tract map for a 48-lot subdivision southeast of the end of South 16th Street and north of Farroll Road.
Read more...


